This program is focused on API 581 methodology, attendees will get a deep understanding not only in the Risk Based Inspection theory but also they will learn how to determine the probability of failure (for different damage mechanisms), the consequence of failure, risk progression, and how to create the recommended risk mitigation activities.
The Attendees also will learn how to create a typical database with the mandatory input usually required by the RBI tools available in the market.
The instructor will explain how to set, manage and use different risk targets to successfully implement and maintain an RBI within your assets, and how to reduce the risk by using the concept of next inspection date instead of the traditional fixed inspection dates.
Key Benefits
- Full and deep understanding of API 581 process to avoid common errors and mistakes when implementing an RBI program.
- Proper Risk Management
- Understanding of the risk progression concept to manage Asset risk.
- Key concepts to develop and implement an RBI program.
- Financial benefits of an API 581 RBI approach
- Extending Shut down intervals
- Identifying Bad actors and triggering risk factors
- Avoiding unnecessary inspections
- Reduce Inspection Coverage For low risk components
- Inspection effectiveness as a potential total cost reduction
Who Should Attend
- Integrity Heads of Department
- Inspection Engineers
- Corrosion Engineers
- Senior Inspection Engineers
- Senior Inspection Engineers
- RBI Engineers
- Reliability Engineers
- HSE Professionals
- NDT Professionals
Key Topics
- Risk Based Inspection Concepts
- Introduction to API 581
- Data Gathering requirements
- Development of Inventory Groups (Consequence of Failure Prerequisite)
- Development of Corrosion Loops (Probability of Failure Prerequisite)
- Assigning API 581 Damage Mechanism and assessing POF
- Calculating available mass and assessing COF)
- Setting Risk Targets
- Risk Calculation
- 1. Current Risk
- 2. Future risk without mitigation activities
- 3. Future risk with mitigation activities
- Target Date and other risk management tools
- Inspection Plan & other Risk Mitigation Activities